K12    HIGHER EDUCATION    FEDERAL    MUNICIPAL     URBAN

Central Load Out Area Control CenterGreen RoofCLACC Break AreaCLACC Back

Central Load Out Area Control Center

Fort Bragg, NC

Construction of a central loadout area control center, an all-weather tracked vehicle assembly and a wheeled vehicle strategic assembly system. Building includes maintenance facility, assembly shelter, sentry booth, scale house, canopy, staging area and connection to the Energy Monitoring and Control System. A green roof was also constructed.